New SSB antenna cable
Monday 22 October: Herrington Harbor North, yard day #6 – VHF and SSB antennas check, and birds poop fighting. Frost on the windscreen this morning, 1degC outside temperature. That is below chilly!…
Monday 22 October: Herrington Harbor North, yard day #6 – VHF and SSB antennas check, and birds poop fighting. Frost on the windscreen this morning, 1degC outside temperature. That is below chilly!…
Sunday 21 October: Herrington Harbor North, yard day #5 – scrape the keel bulb and continue polishing. The wind is howling in the night, and by 3am is pretty clear we won’t…
Saturday 20 October: Herrington Harbor North, yard day #4 – antifouling not stripped off, hardly any progress on polishing the hull, but at least the dinghy is clean! Heavy rain last night,…
Friday 19 October: Day 3 in Herrington Harbor Yard – Gori propeller gets cleaned, stern gland tightened, new gas bottles connected, and gel coat repair on the bow. Frost on the windscreen…
Thursday 18 October: Herrington Harbor North – yard day #2 – slow start of the hired professionals. Today we hope to see some action on the boat by the hired professionals, not…
Wednesday 17 October: Herrington Harbor North – hauled out, but actual jobs still didn’t start. Early rise, we have water depth to check! And sure enough, we see 3.1m. Perfect! So we…
Tuesday 16 October: Herrington Harbor North – lift out didn’t happen due to low water, and we get other jobs done. Lots of rain last night, and noisy squeaky mooring lines. According…
Monday 15 October: Leaving Edgewater, motoring to Herrington Harbor North in Tracy’s Landing MD. Lapping on the stern last night. For sure we didn’t miss that sound. And we haven’t had any…