Sail Cloudy Bay
  • Home
  • About Us
  • Our Boat
  • Cruising route
  • Where is Cloudy Bay?
  • Sail Cloudy Bay

    Fakarava to Rangiroa, via Toau

    Fakarava south to north

    Night from hell!

    A day of liquids storage maintenance

    GlenJun 1, 2021June 2, 20214

    Tue 1 Jun, HHN day 49: Deep bilge cleaned. Diesel fuel tanks polished, hydraulic oil renewed. Hot water tank out, again. You know, there is great merit to having a boat with…

    Read more

    From steering pedestal back to engine room

    GlenMay 31, 2021June 1, 20210

    Mon 31 May, HHN day 48: A day of tying up loose ends. Finalise steering pedestal project, boom spray cover and outhaul car. Removed gas locker lid, fix small leak on water…

    Read more

    Successes on steering pedestal

    GlenMay 30, 2021June 1, 20212

    Sun 30 May, HHN day 47: More electrical work on the steering pedestal: dimmer switch conquered thanks to Giorgio, and USB socket installed. In the evening taken to dinner by Gerret and…

    Read more

    Water tanks and pedestal lights

    GlenMay 29, 2021May 30, 20210

    Sat 29 May, HHN day 46: Check water tanks and finish gas locker. Then remove my gas-engineer hat and replace with electrician’s, to work on pedestal lights and USB socket. Back to…

    Read more

    Boom and gas operations

    GlenMay 28, 2021May 29, 20210

    Fri 28 May, HHN day 45: Outer end of boom fitted and template made for spray protection at front of boom. Then fit new gas solenoid safety valve. Last evening I had…

    Read more

    Autohelm linear drives

    GlenMay 27, 2021May 28, 20212

    Thu 27 May, HHN day 44: Attempt to install quick connect fittings on the linear drives. Did Raymarine sell me a refurbished linear drive? Aft berth area completed, I get my bed…

    Read more

    Hydraulic cylinder back inside boom

    GlenMay 26, 2021May 27, 20210

    Wed 26 May, HHN day 43: Setup air conditioner. Hydraulic outhaul piston installed back inside the boom, mouse lines threaded, and boom ends back on. Then a big thunder storm. Very hot…

    Read more

    Back to outhaul cylinder

    GlenMay 25, 2021May 26, 20210

    Tue 25 May, HHN day 42: New seal kit installed into the outhaul cylinder. My version of hydraulic oil filling and air purging process. Ready to fit back into boom tomorrow. Last…

    Read more

    Posts navigation

    1 … 25 … 127
    View Desktop Version

    Web design by Inedit Web

    Back To Top